| Gallery - Our house | Show album with CoolIris |
| Photo album: "Our house" |
| New wood for winter 2008 |
 |
| Post Date: 12-11-2008 22:46 |
| View |
| We already started burning it, as it's so cold here. Anyway this is the new wood (bought from ASVO) for the winter. 20 bags, 10 birch, 10 mix. (cellar) |
|
| New washing baskets (cellar) |
 |
| Post Date: 12-11-2008 22:47 |
| View |
| Ikea foldable washing baskets. They are quite big actually (lots of washing fits) and have a nice lid to close it off. |
|
|
| Shoe Bench |
 |
| Post Date: 12-11-2008 22:49 |
| View |
| Bench for shoes. Nicely two layered bench. It's upgradeable according to IKEA, you can add a bench on the top, but for now we have enough room ;) |
|
| Medicine cabinet (Closed) |
 |
| Post Date: 12-11-2008 22:50 |
| View |
| The new Medicine cabinet (Closed) in the hall. It's near our stairs / livingroom door. |
|
|
| Smallest heater (500W) |
 |
| Post Date: 12-11-2008 22:51 |
| View |
| Smallest heater (500W) for the smallest room (but still two beds installed. |
|
| Medium heater (700W) |
 |
| Post Date: 12-11-2008 22:56 |
| View |
| Medium heater (700W), this heater is installed in the medium sized room (lol) which is for 2 or more beds. |
|
| Bigger heater (1000W) |
 |
| Post Date: 12-11-2008 22:58 |
| View |
| Bigger heater (1000W) for our double-bed room. Makes our room nice and warm during the cold winters (upto -30 outside, means upto -5 in the house, so really required). |
|
| New fuel-driven lawnmower |
 |
| Post Date: 30-06-2009 22:54 |
| View |
| New fuel-driven lawnmower of over 20 years old and still working fantasticly! Thanks Hallvard! |
|
|
| New kitchen tap |
 |
| Post Date: 30-06-2009 22:54 |
| View |
| New kitchen tap. Thanks Christopher for the installation work! |
|
|
|
|
|
|
|
|
|
|
| Hallvard has come to inspect |
 |
| Post Date: 23-11-2009 10:53 |
| View |
| Hallvard comes to inspect the progress, orders the people around to fix up the bathroom and picks up Theresa, as it was unlivable in the house without a bath, a toilet and without water! |
|
| 2 weeks later, new pipes and insulation |
 |
| Post Date: 23-11-2009 11:04 |
| View |
| 2 weeks later, new pipes and insulation in the livingroom. The ceiling is still laying open and will get new ceilingplates, will take another 2 weeks before they start on it. |
|
|
| the new electricity box in detail (2) |
 |
| Post Date: 23-11-2009 11:05 |
| View |
| the new electricity box in detail (1), the description of the groups.. including the groups that they haven't made yet in lines (they are going to put up new groups towards the kitchen and cellar still). postponed till they are finished with the bathroom and livingroom.. sigh.. |
|
|
| Yay! Our new toilet! |
 |
| Post Date: 23-11-2009 11:05 |
| View |
| Deluxe self-cleaning (well ok.. not entirely I guess) toilet from top branding Porsgrunn. It has eco flush and normal flush, it has a toilet seat that slowly closes, it uses blue soap staves that you enter on the top of the toilet, that will give you that nice smell in the toilet. |
|
| The new floor in the bathroom |
 |
| Post Date: 23-11-2009 11:05 |
| View |
| The new floor with a nice tile of ehm stone tiles... (it's plastic!) has also heating underneath it (integrated in the new concrete). The light that is on the floor will be later used in the hall but is here simply because all lights have been removed from our bathroom and well..we need to see where we pee, don't we! |
|
| An example of the slow closing toilet seat |
 |
| Post Date: 23-11-2009 11:06 |
| View |
| An example of the slow closing toilet seat... as you see.. it's still in the closing move.. no it doesn't move as it is a photo! Come and see, feel and try yourself if you don't believe it. |
|
|
|
|
| And room for towels |
 |
| Post Date: 23-11-2009 11:15 |
| View |
| And room for towels also newly created with the wood panel work.
We will soon get our new bath, new sink and a special cupboard for towels and stuff like toothbrushes, completely with mirror and wallsocket. |
|
| Downstairs in the cellar this has changed |
 |
| Post Date: 23-11-2009 11:15 |
| View |
| They are also changing the waterlines to flexible ones (inside, white) and coloured ones (outside) to clarify what is hot and cold water. They have to connect these still. Cold water is connected again, so we are able to use the water again. |
|
| I think it's also ready for... |
 |
| Post Date: 23-11-2009 11:15 |
| View |
| I think it's now also made ready for a new bathroom in the cellar, if we will ever bother still.
The original plan is a bathroom upstairs.. a bathroom downstairs with shower and toilet and washingmachines etc.. a sauna in the room behind it, and perhaps a hottub outside on te balcony.. dreams ... hehe |
|
|
|
| The planks for the towels etc |
 |
| Post Date: 25-11-2009 10:05 |
| View |
| The planks for the towels etc. We are missing out on the floorheating still and the cupboard with lights installed for the bathroom. |
|
|
| Also the walls are closed up again |
 |
| Post Date: 25-11-2009 10:05 |
| View |
| Also the walls are closed up again. They had to remove a line of stones on the chimney pavement to fit the new woodwork and ceiling and most likely also some insulation material between.
The bath could have fallen down they said, so they had to make the woodwork of the ceiling a little stronger too. |
|
| New mirror and light |
 |
| Post Date: 20-12-2009 19:54 |
| View |
| New mirror and light installed for the bathroom (7-12-2009, yep on Stevens birthday) |
|
|
| Hallvard insulated the bath |
 |
| Post Date: 20-12-2009 20:07 |
| View |
| Hallvard insulated the bath (not the bath itself, but the space between the bath and the wall). |
|
| Finished! |
 |
| Post Date: 20-12-2009 20:07 |
| View |
| Several new things added to the bathroom to make it look very nice. |
|